Latest
UN chief warns of ‘dangerous escalation’ after US strikes on Iran June 23, 2025
U.S. isn’t at war with Iran, ‘we’re at war with Iran’s nuclear program,’ Vance says June 23, 2025
Retaliate now, later or never: June 23, 2025
Pakistan stands with Iran’: PM Shehbaz calls Iran’s President; condemns US strikes June 23, 2025
Many Nations Ready To Supply Iran With Their Nuclear Warheads: Top Putin Aide June 23, 2025
Next
Prev
  • Home
  • Pictorial News
  • Videos
  • Your Story
  • About Us
  • Contact Us
  • Archives
  • Privacy Policy
  • Home
  • Pictorial News
  • Videos
  • Your Story
  • About Us
  • Contact Us
  • Archives
  • Privacy Policy
  • Home
  • Pictorial News
  • Videos
  • Your Story
  • About Us
  • Contact Us
  • Archives
  • Privacy Policy
  • Home
  • Pictorial News
  • Videos
  • Your Story
  • About Us
  • Contact Us
  • Archives
  • Privacy Policy
Home Uncategorized

Chinese group to invest $4.5bn to build refinery in Gwadar: PCJCCI

Editor by Editor
October 29, 2022
in Uncategorized
0
Fang Yulong, Senior Vice President of Pakistan-China Joint Chamber of Commerce and Industry (PCJCCI) and CEO of East Sea Group Limited has planned to invest US 4.5 billion dollars to build a refinery plant with an annual refining capacity of eight million tons in Pakistan. This was stated by him during a briefing at think tank session of PCJCCI on Thursday at PCJCCI Secretariat.

Fang Yulong, Senior Vice President of Pakistan-China Joint Chamber of Commerce and Industry (PCJCCI) and CEO of East Sea Group Limited has planned to invest US 4.5 billion dollars to build a refinery plant with an annual refining capacity of eight million tons in Pakistan. This was stated by him during a briefing at think tank session of PCJCCI on Thursday at PCJCCI Secretariat.

0
SHARES
17
VIEWS
Share on FacebookShare on Twitter

Fang Yulong, Senior Vice President of Pakistan-China Joint Chamber of Commerce and Industry (PCJCCI) and CEO of East Sea Group Limited has planned to invest US 4.5 billion dollars to build a refinery plant with an annual refining capacity of eight million tons in Pakistan.

This was stated by him during a briefing at think tank session of PCJCCI on Thursday at PCJCCI Secretariat.

He said: “We will build an international Gwadar Petroleum Storage and Transportation Trading Center. This project will attract the world’s major oil trading companies and oil companies to Pakistan and we will place at least six ships of crude oil for blending and transshipment operations with a total of two million tons per month at the Gwadar port in Pakistan. It will provide oil to major oil-producing countries in the Middle East of oil transfer, STS and blending services.”

Fang stressed that the development of energy industry is an important catalyst for the transformation of economic structure. It can not only stimulate and guarantee the industrial development of various downstream industries, but also further reduce the trade deficit and increase foreign exchange income reserves in Pakistan.

He added that Gwadar is the throat of several important maritime routes from Africa, Europe, the Red Sea, the Strait of Hormuz, and the Persian Gulf to East Asia and the Pacific. The strategic location close to major oil-producing countries and shipping routes and good political relations with oil-producing countries make Gwadar a potential energy and petrochemical trade center. The establishment of an international Gwadar Petroleum Storage and Transportation Trading Center will bring more powerful support conditions to ensure the diversity, convenience and safety of Pakistan’s energy supply, which will not only further enhance Pakistan’s international influence, but also support the sustainable development of the national economy.

In his closing remarks he said that East Sea Group Limited has great shipping capabilities and rich experience in oil products blending, transshipment and barge operation.

Gwadar’s excellent deep-water port and favorable geographical location, as well as Pakistan’s good and close government relations with surrounding oil-producing countries will definitely add value to this project.

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • December 2020

Srif Pakistan is a news website offering the latest updates and insights on current affairs in Pakistan.
Follow Us
Facebook-f X-twitter Instagram

Quick LInks

  • Home
  • About Us
  • Videos
  • Your Story
  • Contact Us
  • Privacy Policy

Recent Post

Uncategorized

UN chief warns of ‘dangerous escalation’ after US strikes on Iran

June 23, 2025
Political News

U.S. isn’t at war with Iran, ‘we’re at war with Iran’s nuclear program,’ Vance says

June 23, 2025

Newsletter

Subscribe to our mailing list to receives daily updates direct to your inbox!
*we hate spam as much as you do
© 2025 Srif Pakistan. All rights reserved.
  • About Us
  • Contact Us
  • Privacy Policy

Add New Playlist

No Result
View All Result
  • About
  • Archives
  • coming soon
  • Contact us
  • Home
  • Home LGCD
  • Homepage
  • Homepage
  • Homepage1
  • News in pic
  • Newsletter
  • Privacy Policy
  • Privacy Policy
  • R.W Page
  • R.W Page
  • Sample Page
  • test
  • Videos
  • Your Story
  • Youth Corner
  • Youth Corner home

© 2025 JNews - Premium WordPress news & magazine theme by Jegtheme.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/sirfpak1/public_html/wp-includes/functions.php on line 5464